Outdated fiberglass shower removed. And waterproof wallboard prep construction for new tile shower.
Half inch waterproof foam board wall panels installed over existing wall studs. Sealant applied in seams, corners, tub line, and ceiling perimeter.
Tile cut outside, and installed to accommodate plumbing fixtures. Aligned in layout pattern approved by customer prior to installation.
A leveling clip system used during installation to keep tiles uniform aligned and even surface abutting one another.
Call (603)785-0869
Matt Cupan TileWorks
Comments
Post a Comment